News

Thane Municipal Corporation (TMC) on Tuesday said that it will use the rapid-setting concrete on damaged roads in the ...
Work will start Aug. 7 with removal of the current concrete road surface in the southbound lane, followed by base treatment and then concrete paving. The project is anticipated to be finished by ...
When seawater penetrates concrete in road tunnels, a biofilm is formed that breaks down the concrete. This can lead to high costs and the risk of damage if stone and concrete drop from the tunnel ...
So, to alleviate that damage, one of the items was to remove the bumps, which entailed removing a portion of the concrete road surface and then placing back a new roadway concrete surface," said ...
There are 10 areas in Boroondara where the road surface is considered to be part of the “heritage significance”, covering three kilometres – 15 per cent of the council’s concrete roads.